API規格 RP 580, 4th Edition, 2023: Elements of a Risk-Based Inspection Program

API規格 RP 580, 4th Edition, 2023

産業規格・仕様書  >  API  > 




API規格 RP 580, 4th Edition, 2023

74,690(税込)

数量

書名

API RP 580, 4th Edition, 2023: Elements of a Risk-Based Inspection Program
API規格 RP 580, 第4版, 2023:リスクベース検査プログラムの要素
発行元 API
発行年/月 2023年8月
装丁 ペーパー
ページ数 99 ページ
発送予定 海外倉庫よりお取り寄せ 1-2週間以内に発送します
※セキュアPDF版(シングルユーザー), セキュアPDF版 + 冊子版をご希望のお客様は別途お問合せ下さいませ。
※当ウェブ・ショップに掲載のない規格につきましては、別途お問合せ下さいませ。
※掲載の規格は、当ウェブ・ショップに掲載時点で確認できた最新版でございます。 最新の発行状況につきましては受注時に改めて確認をさせて頂きますので予めご了承下さい。


 

Description

Industry Scope

This RP is specifically targeted to the application of RBI in the hydrocarbon and chemical process industries. The principles and concepts herein can be applied in other industries with appropriate documentation.

Purpose
The purpose of this RP is to provide users with the recommended elements for developing, implementing, and maintaining an RBI program. This RP provides guidelines for establishing an RBI program which when implemented properly, will allow the owner-operator to integrate risk assessment and inspection planning into an existing inspection program. The approach emphasizes safe and reliable operation through risk-prioritized inspection. A spectrum of complementary risk analysis approaches (qualitative through fully quantitative) can be considered as part of the inspection planning process.

This RP contains individual sections that describe the steps in applying concepts and principles of an RBI program which include:
a) risk-based inspection analysis methods
b) planning the RBI program
c) roles, responsibilities, training, and qualifications
d) data and information collection for a risk assessment
e) damage mechanisms review
f) assessing probability of failure (POF)
g) assessing consequence of failure (COF)
h) risk determination, assessment, and management
i) other risk management activities
j) evergreening and reassessment of the risk assessment
k) RBI documentation and recordkeeping.

Flexibility in Application
Because of the broad diversity in organizational size, culture, and regulatory requirements, this RP offers users the flexibility to create and implement an RBI Program within the context of existing corporate risk management practices—including the selection and application of a specific RBI methodology.

Various RBI methodologies exist and are currently being applied throughout industry. This RP is not intended to recommend nor endorse any specific methodology for implementing the assessment steps within an RBI program. However, this document is designed to provide a framework that specifies the minimum requirements and expectations needed for a quality risk assessment without imposing undue constraints on users.

This RP is also intended to promote consistency of the process and quality in the identification, assessment, and management of risks pertaining to material deterioration that could lead to failure. Further, the document provides guidance on the recommended work process for conducting and sustaining a successful RBI program.

Mechanical Integrity Focused
The RBI process is focused on maintaining the mechanical integrity of pressure equipment and minimizing the risk of loss of containment due to deterioration. RBI is not a substitute for a process hazards analysis (PHA) nor is it a substitute for hazard and operability assessment (HAZOP). Typically, PHA risk assessments focus on the process unit design, operating practices, and the adequacy of the practices, given the unit’s current or anticipated operating conditions. RBI complements the PHA by focusing on the mechanical integrity related damage mechanisms and managing risk through inspection and complimentary mitigation and/or monitoring programs.

There are other relevant relationships between RBI and other equipment reliability or risk assessment programs in the industry. For example, RBI is complementary to reliability centered maintenance (RCM) programs in that both programs are focused on understanding failure modes, addressing the modes, and therefore improving the reliability of equipment and process facilities. Relevant relationships between RBI and other equipment reliability or risk assessment programs in industry are discussed in 5.8.

Target Audience
The primary audience for this RP is inspection and engineering personnel who are responsible for the mechanical integrity and operability of equipment covered by this RP. While an organization’s inspection or materials engineering group may champion the RBI initiative, RBI is not exclusively an inspection activity. RBI requires the involvement of various segments of the organization such as engineering, maintenance, and operations. Implementation of the resulting RBI product (e.g. inspection plans, replacement/upgrading recommendations, other mitigation activities, etc.) may rest with more than one segment of the organization. RBI requires the commitment and cooperation of the organization. In this context, all stakeholders who are likely to be involved should be familiar with the concepts and principles embodied in the RBI methodology to provide the necessary support for the RBI assessment and in the interpretation and application of the results as it relates to their specific function.

RBI Assessment Benefits and Limitations
An RBI program can provide the following benefits:
a) identification of risk drivers
1) damage mechanisms and damage modes
2) equipment with insufficient or inadequate inspection history
3) consequence driven equipment not impacted by inspection
4) safety, health, environmental and/or economic consequences

b) development of an inspection plan
1) techniques and methods to be used for proper detection and quantification
2) establishment of the extent of inspection (e.g. percent of the total area to be examined or specific locations)
3) provision of the inspection interval or next inspection date (timing)

c) optimization of resources

d) identification of mitigation activities which can further reduce risk for the facilities and equipment assessed

e) acceptance/understanding of the current risk

f) provision for other applicable risk mitigation activities (including but not limited to):
1) establishing and maintaining Integrity Operating Windows (IOWs)
2) reducing personnel exposure to high-risk areas
3) upgrading to materials of construction less susceptible to degradation
4) reducing the consequence of failure (e.g. limiting inventory, detection, and mitigation controls)
5) repair or replacement

The risk assessment can identify equipment that does not require inspection or mitigation because of the acceptable level of risk associated with the equipment’s operation. In addition, there can be synergies between the RBI process and process safety management and turnaround activities that may further decrease the amount of inspection related activities. These synergies can lead to a potential decrease in operating expenses, while also reducing the facility risk.

An RBI assessment is limited by and will not compensate for:
1) inaccurate or missing information
2) inadequate design, faulty equipment installation, or inadequate testing or commissioning of equipment
3) operating outside the acceptable process limits (e.g. not to exceed limitations, IOWs, etc.)
4) not effectively executing the plans
5) lack of qualified personnel or teamwork
6) lack of sound engineering or operational judgment
7) lack of follow-up on inspection findings or recommendations
8) construction and fabrication errors