AAMI規格 AAMI TIR59, 2017: Integrating human factors into design controls, 人的要因の設計管理統合

AAMI規格 TIR59, 2017

産業規格・仕様書  >  AAMI  > 




AAMI規格 TIR59, 2017

52,800(税込)

数量

書名

AAMI TIR59, 2017: Integrating human factors into design controls
AAMI規格 TIR59, 2017: 人的要因の設計管理統合
発行元 Association for the Advancement of Medical Instrumentation (AAMI)
発行年/月 2017年1月   
装丁 ペーパー
ページ数 37 ページ
発送予定 海外倉庫よりお取り寄せ 1-2週間以内に発送します
※PDF版をご希望のお客様は別途お問合せ下さいませ。
※当ウェブ・ショップに未掲載のAAMI規格につきましては、別途お問合せ下さいませ。
※掲載の規格は、当ウェブ・ショップに掲載時点で確認できた最新版でございます。
最新の発行状況につきましては受注時に改めて確認をさせて頂きますので予めご了承下さい。

 

Description

This TIR was developed to provide background and information regarding HFE/UE activities and their corresponding applicability to DESIGN CONTROLS in accordance with 21 CFR 820.30. The scope of this TIR applies to all developers and MANUFACTURERS of medical devices and combination products that contain a device constituent part. The TIR is for those MANUFACTURERS intending to commercialize products in the United States and therefore does not address all requirements for commercializing products outside the U.S.

While this TIR presents specific recommendations for aligning HFE/UE processes to DESIGN CONTROLS, it is recognized that MANUFACTURERS may develop their own methodologies, processes, and customized QUALITY SYSTEMS in order to ensure compliance with 21 CFR 820.30 and other regulations. MANUFACTURERS should consider evaluating the recommendations in this TIR and the resultant impact to their existing QUALITY SYSTEMS and processes, including compliance with ANSI/AAMI/ISO 13485 and ANSI/AAMI/ISO 14971, as applicable.

This TIR presents specific DESIGN CONTROLS activities as specified in 21 CFR 820.30; however, it does not cover all elements within 21 CFR 820 or 21 CFR 820.30. The focus of this TIR is DESIGN CONTROLS activities that overlap functionality with HFE/UE processes, leading to robust HFE/UE documentation in support of a MANUFACTURER'S DESIGN HISTORY FILE [21 CFR 820.30 (j)] and HFE/UE FILE [ANSI/AAMI/IEC 62366-1:2015]. In addition, MANUFACTURERS establish QUALITY SYSTEMS to be compliant with 21 CFR, as well as ANSI/AAMI/IEC 62366-1:2015 (referred to as “ANSI/AAMI/IEC 62366-1” throughout this document), and the scope of these systems is dependent on multiple variables, such as overall MANUFACTURER size and device complexity. As such, this TIR is intended to provide general overviews, recommendations, and deliverables with respect to DESIGN CONTROLS and HFE/UE for MANUFACTURERS to utilize and customize according to their own QUALITY SYSTEMS and procedures.

Figure 1 below provides a detailed mapping of HFE/UE integration as part of DESIGN CONTROLS where activities performed produce HFE/UE deliverables. Some of these deliverables are considered “live” and are required to be updated when new information is produced. For instance, “Updated RISK ANALYSIS” is a HFE/UE deliverable due to activities produced in DESIGN OUTPUT, VERIFICATION, VALIDATION, Submission, and In Market after the initial RISK ANALYSIS deliverable performed in DESIGN INPUTS.